Enigma were approached by Beacon Design to manufacture and install a new servery counter at Malvern College.

The servery was manufactured with heat resistant materials, allowing for all of the various components to be installed into the counters.

Access to the building was limited so the counter had to be made in our workshop to be fully demountable and then re-assembled on site.

The counter was a huge success with the college and looks fantastic.

It took 3 weeks to manufacture and 3 days to install.